Lamborghini Miura Restoration Log
6 July 2009:
A trip to the body shop revealed more progress. The chassis is inverted and frame rails have been cut open, and the floors removed. Repairs to the affected areas have begun. The deterioration to the rear of the chassis is not as severe as that to the front.

New sheetmetal for the underside of the engine cradle

Repairing the underside of the central tunnel


Front section, cut open

Detail of the tunnel
